Introduction
Time is money — especially when renovating a whole house. Whether you're planning to live in or flip the property, understanding the timeline of 全屋裝修 is crucial for planning and budgeting.
1. Planning and Design Phase (2–4 Weeks)
This includes consultations with designers, architects, and contractors. You’ll finalize your budget, materials, and layout in this period.
2. Permits and Approvals (2–6 Weeks)
Depending on your location, getting building permits can be a lengthy process, especially if zoning adjustments are needed.
3. Demolition (1–2 Weeks)
Stripping interiors down to the bones is fast but messy. This is a critical phase where unforeseen issues often arise.
4. Structural Changes (2–4 Weeks)
If you're moving walls, building extensions, or reinforcing structures, this will be one of the longest and most technical stages.
5. Systems Installation (2–3 Weeks)
Plumbing, HVAC, and electrical systems are installed or upgraded during this phase. It requires inspections before proceeding further.
6. Interior Finishing (3–6 Weeks)
This includes drywall, flooring, painting, cabinetry, and fixtures. Timelines vary depending on material availability and workforce.
7. Final Touches and Cleanup (1–2 Weeks)
From installing appliances to deep cleaning, this phase readies the house for move-in or showing.
8. Delays to Expect
Weather, material shortages, and contractor scheduling can all push back your timeline. Being realistic helps manage expectations.
Conclusion
On average, 全屋裝修 can take anywhere from 3 to 6 months, depending on the size of the house and complexity of work. Proper planning, a good contractor, and a flexible mindset are key to a successful and timely renovation.